What should an installation acceptance checklist cover?

Acceptance is split into five groups so that a wiring defect is not hidden by a working dashboard. Each group has its own checklist before the final conclusion is signed.

Check construction quality, then functional acceptance, then confirm the configured parameters, hand over the documents, and record the final conclusion. Functional tests do not replace the wiring, waterproofing and grounding checks.

What are the five acceptance groups?

Group names and their checklist areas follow the SAFEBACK acceptance standard; project-specific pass criteria are set in the signed technical agreement.

GroupChecklist areas
Construction qualityCabinet mounting, wiring quality, conduit and waterproofing, grounding, sensor mounting, optional VFD installation
Functional acceptanceBasic functions, control functions, alarm functions, protection functions, optional VFD functions
Parameter confirmationRecord the configured thresholds and control parameters
Document handoverHand over the wiring, configuration and acceptance documents
Acceptance conclusionSign off the final conclusion

Frequently asked questions

Do I need to register or leave an email to use these guides?

No. All troubleshooting and commissioning guides on this site are open pages with no form and no email gate. The full product datasheets are also open on the downloads page.

Do these pages publish spare-part prices or service fees?

No. These pages publish technical checks, wiring rules and procedures only. For spare parts, service terms or a quotation, contact [email protected].

Does a working dashboard mean the installation passes?

No. Construction quality checks — cabinet mounting, wiring, conduit and waterproofing, grounding and sensor mounting — are a separate acceptance group.

Where do I get the commissioning sequence before acceptance?

See the 10-step commissioning checklist; acceptance follows commissioning and parameter configuration.

Source: SAFEBACK acceptance standard and checklist. Field note: this page lists the acceptance structure, not commercial terms; pass criteria are defined per project in the technical agreement. Checked 2026-11-07.